Water Corporation engineering design standards
Revision status
DS 51 - Design and construction of wastewater pumping stations and pressure Mains
| DS 51 - Design and Construction of Wastewater Pumping Stations and Pressure Mains | Version/Revision |
| DS 51 - Design and Construction of Wastewater Pumping Stations and Pressure Mains 4 to 90 Litres per Second Capacity | Ver 2 Rev 5 |
| DS 51 - Design and Construction of Wastewater Pumping Stations and Pressure Mains 4 to 90 Litres per Second Capacity - Standard and Example Drawings | Ver 2 Rev 5 |
DS 60 - Distribution pipelines other than reticulation
| DS 60 - Distribution Pipelines Other Than Reticulation | Version/Revision |
DS 63 - Water reticulation pipelines
| DS 63 - Water Reticulation Pipelines | Version/Revision |
| DS 63 - Water Reticulation Pipelines DN 250 and Smaller | Ver 3 Rev 7 |
| DS 63 - Water Reticulation Pipelines DN 250 and Smaller - Standard Drawings List | Ver 3 Rev 7 |
| DS 63-01 - Water Reticulation Standard - Supplement - Dual Water Supply Systems | Ver 3 Rev 7 |
DS 65 - Pipe fittings
| DS 65 - Pipe Fittings | Version/Revision |
| DS 65 - Pipe Fittings Standard Drawings | Ver 2 Rev 1 |
DS 66 - Urban main drainage standard
| DS 66 - Urban Main Drainage Manual | Version/Revision |
| Urban Main Drainage Manual | Ver 1 Rev 2 |
DS 50 - Design and construction requirements for gravity sewers
| DS 50 - Design and construction requirements for gravity sewers | Version/Revision |
| DS 50 - Design and construction requirements for gravity sewers - Sewers DN 150 to DN 600 | Ver 1 Rev 0 |
For details regarding acquisition of the above Water Corporation Engineering Design Standards, please email idb.standardsenquiries@watercorporation.com.au.